Performance Building Group were asked to complete the internal fit out at the Roma Saleyards.
The of work completed by the team include the installation of the doors, cladding and the exotec soffits.
PBG were asked to complete a full demolition and rebuild of the existing Neonatal ward to modernise the space and make room for an additional two Humidicribs.
PBG carried out a full demolition and rebuild of the Angio Room to allow for a new Siemens Angiograph Radiology Machine.
All walls, windows and doors needed to be lead lined and were installed by the team at PBG.
Performance Building Group were contracted by Hutchinson Builders to complete the corrugated iron, insulated panels, and roofing around the lift shaft.
This project came with the challenge of transporting materials and supplies, as they had to be carried by hand up the 40 meter high shaft due to the lift not being operational while construction was underway.
PBG were contracted to give this home a full face lift.
This home was demolished to the floorboards and was completely rebuilt. The neutral colours and new floor plan bring a fresh and modern feel to the home that the whole family can enjoy.
Performance Building Group were engaged to construct a new residential dwelling in Cabarlah.
This home welcomes you with a WOW with its grand timber door and stone entrance, continuing to a beautifully finished home full of modern fixtures and lovely cladding feature walls throughout.
PBG Completed the installation of the timber frames and trusses to the main office and Dispatch office. Internal fit out of timber doors and hardware and installation of sundry hardware include PWD fit out
PBG Completed the installation of the Hardigroove soffit and install feature ceiling and walls
PBG Completed the installation of Steel frame and trusses, timber doors and hardware, fit out of sundry hardware including PWD fit outs, feature matrix/ axon cladding and FC soffits
PBG Completed the entire shop fit out for the first Pattysmith Burger outlet in Queensland. We were tasked with an empty shop and turn it into what is arguably the best burger café in Toowoomba
Performance Building Group (PBG) were engaged by the FKG Group as a trade contractor on the Bellevue Hotel Conversion project.
Performance Building Group (PBG) were engaged to construct a residential dwelling in East Toowoomba
PBG Completed Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out, installation of feature feature aluminium batons.
PBG Completed the installation Steel frames and truss, External Exotec cladding, Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out
PBG Completed the installation Steel frames and truss, External Exotec cladding, Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out, Installation of feature ply to sports hall
Performance Building Group were asked to complete the installation of the external exotec soffits.
PBG also installed the doors, fire doors, and internal perforated timber walls
PBG were engage renovate this Rangeville home. The Scope was to modernise and update the Kitchen, Games Room, Bar Room, Lounge room and Outdoor Covered Pizza Oven area
PBG Completed the installation off all windows, timber skirting, Sundry hardware fit out, Feature Innowood timber cladding
Performance Building Group (PBG) were engaged to deliver a full renovation to the Master Bedroom, Walk-in-robe, Ensuite, Office, Rear Deck, Driveway and downstairs Powder Room to the residential home in Rangeville.
PBG were engaged to transfer the basic hardstand area into the now new food court and seating area for Westridge Shopping Centre. Working inside an existing shopping centre brings its own level of challenges. Most of the works had to be completed outside of business hours to not disrupt the day to day shops that were operational.
‘Performance Building Group has provided professional and expert construction services to Hallmark Property over a number of commercial projects. These range from small to large retail shop fit outs to complete office extensions and everything in between. Adam and his team will work in with you no matter the situation which is a very valuable asset as we all know construction is a very dynamic environment. Their “nothing is a drama” approach has been invaluable in keeping Hallmark Property’s business flowing especially in and around trading stores in the retail environment with multiple stakeholders to liaise with. We would highly recommend Performance Building Group for your next project be it a small refurb, residential home, shop fitout or commercial project. They will perform.'
ADAM THOMAS | DIRECTOR
0488 441 138
[email protected]
JOHN NICHOLAS | DIRECTOR
0416 362 962
[email protected]
ADDRESS
Unit 6/1-5 Gardner Court, Wilsonton QLD 4350