slim header

our service

Contract Carpentry Services

Education and training

Health

Retail

Industrial

Sports and leisure

Energy and resources

Sectors we work in

Commercial Construction

Education and training

Health

Retail

Industrial

Sports and leisure

Energy and resources

Building and Asset Services

Roma Saleyards

Performance Building Group were asked to complete the internal fit out at the Roma Saleyards.

The of work completed by the team include the installation of the doors, cladding and the exotec soffits.

Neonatal- Toowoomba

PBG were asked to complete a full demolition and rebuild of the existing Neonatal ward to modernise the space and make room for an additional two Humidicribs.

Angio Room, Toowoomba Base Hospital

PBG carried out a full demolition and rebuild of the Angio Room to allow for a new Siemens Angiograph Radiology Machine.

All walls, windows and doors needed to be lead lined and were installed by the team at PBG.

Big Rig Roma

Performance Building Group were contracted by Hutchinson Builders to complete the corrugated iron, insulated panels, and roofing around the lift shaft.

This project came with the challenge of transporting materials and supplies, as they had to be carried by hand up the 40 meter high shaft due to the lift not being operational while construction was underway.

Mount Lofty Renovation

PBG were contracted to give this home a full face lift.

This home was demolished to the floorboards and was completely rebuilt. The neutral colours and new floor plan bring a fresh and modern feel to the home that the whole family can enjoy.

Cabarlah House

Performance Building Group were engaged to construct a new residential dwelling in Cabarlah.

This home welcomes you with a WOW with its grand timber door and stone entrance, continuing to a beautifully finished home full of modern fixtures and lovely cladding feature walls throughout.

Egg Factory

PBG Completed the installation of the timber frames and trusses to the main office and Dispatch office. Internal fit out of timber doors and hardware and installation of sundry hardware include PWD fit out

Summer House

PBG Completed the installation of the Hardigroove soffit and install feature ceiling and walls

Renal, Queensland Health

PBG Completed the installation of Steel frame and trusses, timber doors and hardware, fit out of sundry hardware including PWD fit outs, feature matrix/ axon cladding and FC soffits  

Patty Smith's

PBG Completed the entire shop fit out for the first Pattysmith Burger outlet in Queensland. We were tasked with an empty shop and turn it into what is arguably the best burger café in Toowoomba

Bellevue Hotel Conversion

Performance Building Group (PBG) were engaged by the FKG Group as a trade contractor on the Bellevue Hotel Conversion project.

East Toowoomba New Dwelling

Performance Building Group (PBG) were engaged to construct a residential dwelling in East Toowoomba

Mackay Northern Beaches

PBG Completed Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out, installation of feature feature aluminium batons.

Kingaroy Dental

PBG Completed the installation Steel frames and truss, External Exotec cladding, Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out

Highfields State High School

PBG Completed the installation Steel frames and truss, External Exotec cladding, Installation of all timber doors and door hardware, Installation of Sundry Hardware including PWD fit out, Installation of feature ply to sports hall

Centenary Heights State High School

Performance Building Group were asked to complete the installation of the external exotec soffits.

PBG also installed the doors, fire doors, and internal perforated timber walls

Rangeville Renovation 2

PBG were engage renovate this Rangeville home. The Scope was to modernise and update the Kitchen, Games Room, Bar Room, Lounge room and Outdoor Covered Pizza Oven area  

Harristown State High School

PBG Completed the installation off all windows, timber skirting, Sundry hardware fit out, Feature Innowood timber cladding

Rangeville Renovation

Performance Building Group (PBG) were engaged to deliver a full renovation to the Master Bedroom, Walk-in-robe, Ensuite, Office, Rear Deck, Driveway and downstairs Powder Room to the residential home in Rangeville.

 

Westridge Food Court, Toowoomba

PBG were engaged to transfer the basic hardstand area into the now new food court and seating area for Westridge Shopping Centre. Working inside an existing shopping centre brings its own level of challenges. Most of the works had to be completed outside of business hours to not disrupt the day to day shops that were operational.

  • ‘It is tribute to the incredible work ethic of Adam and his team that Hutchinson Builders continues to engage Performance Building Group to deliver multi-million dollar projects for both private and public sectors.

    ‘Having worked with the team on projects such as the St Vincents Private hospital Redevelopment, Ergon Depot Toowoomba and numerous high end retail tenant fit outs, I can attest to the fact that we are consistently impressed with the outcome of PBG’s work – the workmanship and finish is first-class.’

    Nick Linnan | Hutchinson Builders

mbq  cm3

ADAM THOMAS | DIRECTOR

0488 441 138
[email protected]

JOHN NICHOLAS | DIRECTOR

0416 362 962
[email protected]

ADDRESS

Unit 6/1-5 Gardner Court, Wilsonton QLD 4350